What shapes the planning range
- Cabinet quantity, construction, interior accessories and custom panels
- Countertop material, edge details, backsplash and fabrication complexity
- Appliance specifications and changes to electrical, plumbing or ventilation
- Flooring transitions, lighting layout and work that extends into the main floor
- Existing-condition repairs, access, protection and disposal requirements
$45,000-$95,000 is Nivo's early planning range for a standard-size project with upgraded finishes and standard renovation conditions. It is not a quote or a published market average. HST, design, engineering, permits, appliances, hazardous-material work and unknown conditions may sit outside the result.
What the project manager confirms
- Accurate room dimensions, openings and ceiling conditions
- Island clearance, appliance doors, seating and circulation
- Service locations, panel capacity, ventilation and permit questions
- Finish expectations, allowance level, timing and rooms included in scope
Move from idea to comparable scope
- 01
Confirm the room
Measure the existing layout and identify conditions that cannot be assumed from photographs.
- 02
Lock major selections
Coordinate appliances, cabinetry, counters, plumbing fixtures, lighting and flooring before ordering.
- 03
Build the quote
State inclusions, allowances, exclusions and responsibilities so the PM can price the same scope the homeowner expects.
Answers before the first PM conversation
How much should I plan for a Toronto kitchen renovation?
Nivo's early planning range for a standard-size kitchen with upgraded finishes is $45,000-$95,000 CAD. It is not a quote or market average; size, cabinetry, appliances, service changes, site conditions and the surrounding scope can move the result.
Does keeping the same kitchen layout reduce complexity?
It can reduce some plumbing, ventilation and electrical changes, but the existing locations still need verification. Cabinet dimensions, appliance clearances and current code or service conditions can affect the final plan.
What should be decided before the quote is finalized?
Confirm the appliance list, cabinet direction, counter and backsplash allowance, sink and faucet, flooring, lighting, rooms included and any work expected from separate designers or suppliers.